As I look back on what I learned in
this course the two main topics I feel will apply to me the most are the BIM
and Database topics. I am pursuing more of a career in the construction
industry and it is almost a staple in and General Contracting company is to
have a Revit model. The Revit model helps the general contractor to estimate,
detect any problems with the plans easier, and to also show the owner a pretty
picture of their building. This helps streamline the process once the model is
built in Revit. Building a model in Revit can take anywhere from a few days to
over a month depending on the size of the building. I have worked for a civil
construction company that uses Agtek and Sketchup to model the various projects
like large sites with a lot of earthwork or bridges to help with estimation.
What these programs also do is allow for the contractor to see where the cut
and fills are on the site, and also show the owner that “this is a big problem”
or this is how you can fix it easily. I find that programs that are able to
model the project are very beneficial in the construction industry as it allows
both the contractor to see the finished product and to also show the owner what
it will look like once completed.
The other topic that I found
interesting is the database topic and the assignment that went with the topic. When
I was completing the project I kept thinking of how this may or may not relate
to my previous co-op positions and how they may utilize it in their everyday
work. The one way in which I found this may be helpful in a contractor’s
company is to have a relational database about all of their subcontractors.
Being able to go into on place and find a subcontractor based on the work they
do is very beneficial. The company I worked for was using an excel spreadsheet
which made it somewhat difficult at times to find the contractor you were
looking for. A database of all of these contractors would help with the
estimation process. Another database I think would be beneficial to have is one
that stores all of the information from previous jobs and how they long each
activity took. This helps ensure the estimator allows for enough time for its
company to finish the activity. This is important because if he does not
estimate the project properly the company could lose a lot of money. The entire
goal of any project is to make as much money as possible.
COMMENTS:
Jacob Wahbleh
I think that BIM is and will become a bigger impact on our
industry. I believe that every company I interviewed for asked about the
various programs I have used in my time here at Drexel. These companies are
aware of where the industry is going and they want to invest in those students
who know how to model the buildings, bridges, site, etc. so that they can see
it and show it to the owner.
Andrew Maita
I like you signed up for AE 410 for the reason that it could
count as a Technical Elective for one of majors. I had also heard from others
that it was an interesting class and many recommended it to me. This put into
perspective the various technologies that are already in place in the industry that
I had not realized until taking this course. Reflecting on my co-ops I am able
to see these technologies at work and the potential for them all.
Mark Odorizzi
You bring up the interesting point that having more
knowledge in new technologies could and most likely will set you apart from
other potential candidates. I believe employers are looking for employees that
are able to learn new technologies quickly or have that knowledge already
because we are currently in a transition period where our industry is catching
up on all the technology out there. Companies are investing in this industry
and creating specific departments within to deal with and implement these
technologies such as BIM or a generic modeling division.