Showing posts with label GSI Design. Show all posts
Showing posts with label GSI Design. Show all posts

Tuesday, February 13, 2018

Quelly Wk 6-1: B5, Databases in Construction

B5: Functionality of Databases during Construction

With my little experience in construction management (working as a construction inspector for PWD), one of the main challenges I faced on the job site was the communication of information from the clients (the PWD design engineers) to the contractor, and back (to me in the field). As database technology continues to develop, there is therefore an increasing applicability in the construction process.